Action A2 completed

Action A2 (Survey on Italian, Belgian and Dutch WRRFs) has been completed. In this action, the WRRFs characteristics that could influence the prototype design and development were assessed. This evaluation

Share
A2 – Genova Sestri Ponente WRRF – Monitoring campaign completed

The monitoring campaign for the in-depth characterization of the plants.

Share
Action A1 completed

The action A1 (Test WRRF characterization) has been completed. In this action, the efficiency of the oxidation tanks of CUOIODEPUR has been evaluated and the biomass has been characterized. The space-time variability of air

Share
A1 – Cuoiodepur WRRF – Third monitoring campaign completed

The third monitoring campaign for the in-depth characterization of test plant in terms of biological tanks inlet and outlet quality, oxygen and air spacial distribution and biomass cinetic parameter assessment

Share
B1 – Lessdrone design completed

The design of the LESSDRONE has completed. The second part of the B1 action will be used for the construction and refinement of LESSDRONE prototype.

Share
A2 – S. Colombano and Roma est WRRFs – Monitoring campaigns completed

The monitoring campaign for the in-depth characterization of the plants.

Share
A1 – Cuoiodepur WRRF – Second monitoring campaign completed

The second monitoring campaign for the in-depth characterization of test plant in terms of biological tanks inlet and outlet quality, oxygen and air spacial distribution and biomass cinetic parameter assessment

Share
Eindhoven and Tilburg WRRFs – Monitoring campaigns completed

The monitoring campaign for the in-depth characterization of the plants.

Share
Questionnaire on Italian and Be.Ne.Lux. WRRFS sent

A questionnaire survey has been sent to Italian and Be.ne.lux water utilities

Share
Cuoiodepur WRRF – First monitoring campaign completed

The first monitoring campaign for the in-depth characterization of test plant.

Share